Project Description
- Third project for MilliporeSigma (formerly EMD Millipore).
- Built a new gowning room for both the existing Mobius II cleanroom and new Mobius III cleanroom. Gowning room work had to occur while Mobius II was still in operation.
- Additional 6,000 sf of non classified packaging, inspection, testing and warehouse space.
- Demolition and build out done in detailed phases in order to keep production online.
- Installed another structural steel platform on the roof for Mobius III’s own HVAC system.
- Added chillers, makeup air units, and a new steam boiler for humidification.
- Added another emergency generator for Mobius III.
- Multiple tie over were made to the existing systems, performed total balancing and certification.